Comox Valley Mountain Biking Forums and Trail News

Riding Island Style - Forums, Reviews, Photos and More!


Cumberland Trails Thread

Last post 10-23-2008 6:31 PM by MikeB. 64 replies.
Page 5 of 5 (65 items) < Previous 1 2 3 4 5
Sort Posts: Previous Next
  • 07-06-2008 5:51 PM In reply to

    Re: Pity the Fool (that would be me - the fool)

    OK - fixed the trail.  Posted all of the pics etc. on NSMB:  http://bb.nsmb.com/showthread.php?t=112222

  • 07-29-2008 2:03 PM In reply to

    • Skifreak
    • Top 10 Contributor
    • Joined on 03-28-2006
    • Dodge City, BC
    • Posts 567

    Update for July 29th

    Hope everyone has been enjoying the local trails lately. There have been some really busy workers out building and repairing a great number of trails locally in Cumberland.

    I'll try to do a rundown of all the various updates.

    Bucket of Blood - trail above Forest Dump has been saved from logging. new trail to be built through clear cut when the weather gets cooler and damper. 

    Bear Buns - New trail built parallel to Perseverence Creek turning right from Bucket just after Dodge Balls. Still quite fresh but should be a very scenic trail when finished.

    Logging of lower Bucket - the logging seems to be finished and when they removed their machines a new version for the lower sections of Bucket has been cleared. Should provide for some really fun build options. More to come this fall.

    Allen Lake Trails - new trails built before the BC Bike Race connect the Trent River Main to Steamdonkey and Teapot. The old cordury road travels through some scenic forest and heads by some very old service bridges. A couple of trestles lie in ruins near the trail. Good for the XC and all mountain bike crowds. 

    Sykes Bridge - built just a few weeks ago, this bridge connects new and old as it crosses a former logging bridge site across Perseverence Creek. You will remember this location as where the trail sections of Bucket dropped you onto a road bed near the creek. Join this one after travelling down Bear Buns to jump over to Teapot. 

    Bear Highway - some rebuilding and new trails were built this spring near the old Bear Highway, along with repairs on Sub Human and Cherry Picker. Check the map for updates.

    Post a reply if I've missed any of the updates and have good fun exploring the new trails.

    www.cvmtb.com
  • 08-22-2008 12:05 PM In reply to

    Bucket Re-Build

    Hey - who's up for helping re-build Bucket?  I'm raring to go (and even willing to spearhead/organize the deal).

     Let me know - I will chat up James and Dan also.

  • 10-23-2008 12:46 AM In reply to

    • Jazzwax
    • Top 10 Contributor
    • Joined on 02-07-2008
    • Courtenay
    • Posts 91

    Re: Bucket Re-Build

    Bucket is now nearly done apparently...who's building the berm at the bottom of Space Nugget?

  • 10-23-2008 6:31 PM In reply to

    • MikeB
    • Top 25 Contributor
    • Joined on 10-09-2007
    • Posts 17

    Re: Bucket Re-Build

     Hey guys,

    While going to tied knot just under a week ago, I noticed there a creek crossing at the bottom of the hill. I'm thinking about building a makeshift bridge to just throw over the water, so hikers can cross it without getting a shoe full of cumberland water.

    Does anyone forsee any issues?

    Mike

Page 5 of 5 (65 items) < Previous 1 2 3 4 5


Theme design is Mira 2007 by Chris Lotter.

Copyright 2008 Comox Valley Mountain Biking

Powered by Community Server (Non-Commercial Edition), by Telligent Systems